Plan My Splits

Which splits can I use for my next HYROX race?

Use this card with your own singles result. Fill in the section that applies to your next race. Keep your result open.

Last race and division Next race and division
Published finish Next-race goal Gap

If a split looks unusually slow

  1. Open your individual result and look under Judging Decision → Penalty. Record what the result actually shows. HYROX results help
  2. Mark one. Listed, amount and segment Checked, none listed Couldn't verify
    Result status if shown Source or screenshot reference
  3. Which published split already includes the penalty? Displayed split
    Where can you verify that? Finish only Split inclusion unclear
    The judging entry identifies the infraction. Check separately where the seconds appear in the timing. Keep the published finish as your baseline.
  4. How many penalty seconds do you expect to avoid? sec. What will you do differently, and what time will that take?
    Use the net seconds you can justify. Use 0 if the penalty or the cost of avoiding it is unclear.
  5. Where did you count those seconds in your plan? Split name or separate finish adjustment . Count them once. If the split also has a fitness gain, write its reason and seconds separately.
Goal check Your entry
Gap from published finish to goal sec
Net penalty seconds counted once sec
Other changes only (split, seconds saved, reason)
Still unassigned after all other changes = gap − net penalty saving − other net savings sec
Projected finish = published finish − total net savings

Read your original plan once more. Which entry needs changing, if any? . Keep an entry that already counts the penalty once and supports its other savings.

Practice example with invented numbers. A published 1:12:00 includes a 0:30 penalty in lunges. For a 1:10:00 goal, avoiding all 30 seconds at no extra time cost leaves 90 seconds to find. If a separate wall-ball change saves 60 seconds, 30 seconds are still unassigned. If you keep the penalty in the plan and make only the wall-ball change, 60 seconds are still unassigned.

If your next division is different

Which station are you reviewing? What changes in the next division?
Where did you check? What came immediately before the training effort?

Segment Old split Tool displays Athlete adopts Mark one status for this row
Station: Tested in sequence Estimate Leave open
Following run: Tested in sequence Estimate Leave open

Use Tested in sequence when you timed the station at the new load and the run immediately after it in one effort. An isolated station time can support a station estimate. You can leave the following run open. If the tool restores a number, record it under Tool displays and leave the adopted target empty. An open target has no seconds difference yet.

Projected finish shown by tool Projected finish you adopt
If a key split is open, you can leave your projected finish open too. What would you test next?

See the Miami Beach worked example

Download the Miami Beach worksheet (PDF)